pithead
1. Knotted link chain hoisting clothes in pithead baths; unproofed, non-calibrated
不按量规允差非经检验的洗衣房运衣服升降机的节链
2. Conditions at the village contrasted sadly with the training centre. For a start, there were no pithead baths.
乡村里的条件同培训中心相比是太差了。首先,没有浴池。
3. pithead industry coal mine
井工矿
4. From the characteristic of prop and actual conditions of coal seam and roof in Datai pithead, the support force of the dense prop in 揝ichuan Method?is calculated.
从单体液压支柱的特性出发,结合大台井实际的煤层和顶板条件,计算了俯伪斜走向分段密集采煤法密集柱的支撑力。
5. Co-Production System in Pithead based on the Coal Gasification
以煤气化为核心的坑口多联产系统
6. The computer program may assist decision-making in the way of helping decision-makers to select scientificaly the average grade of ore in pithead heap-leaching mining under a total cost.
利用该经济评价模型开发的计算机软件,可以进行辅助决策,帮助决策人员科学地确定某一开发成本下坑口堆浸的矿石平均品位。
7. The program of heat and power plant of former and responsible whole nation, development, and the construction of large pithead power station and transmission network and move.
前者负责全国热电厂的规划、开发,以及大型坑口电站和输电线路的建设和运行。
8. pithead heap-leaching
坑口堆浸
9. pithead power plant
坑口电厂
10. Keywords complicated geography condition pithead position industrial site;
复杂地形条件;井口位置;工业场地;
11. Analysis on supporting stability of "Shichuan mining method" for Datai pithead
大台井"川法"支护系统稳定性分析
12. Choice Argument of Mining Coal Methods of Opencut Mining Non-mining Field in Anjialing Pithead Industry Coal Mine
安家岭井工矿露天不采区采煤方法的论证选择
13. Conservation scheme of soil and water of Xingning Xingda Pithead (Gangue) Power Plant in Guangdong
广东兴宁兴达坑口(煤矸石)电厂水土保持方案必要性及机组性能分析
14. By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.
摘要通过对硬岩型铀矿坑口堆浸法的工艺流程分析,总结出坑口堆浸成本由矿石开采费用、主要原材料费用等14项要素组成,并建立了地质经济评价模型。
15. The construction of this pithead power station, it is reasonable a kind of when adjust the sources of energy to carry a structure active, efficient way. 2.
此坑口电站的建设,是合理调整能源运输结构的一种积极、有效的办法。
16. Shallow views on the determination of connecting points between coal mine's pithead power plant and transmission networks
浅谈煤矿自备电厂与电网的连接点的确定
17. Comprehensive utilization of cinders at coal mine pithead power plant
煤矿坑口电厂粉煤灰的综合利用
18. Because resource is atrophic, original pithead 10, already shut 6 now.
由于资源萎缩,原有坑口10个,现已关闭6个。
19. Pulley for clothes hoists in pithead baths
矿口浴室衣服升降机用滑车
20. The technique and application of the three-squared septic tank of arched Brickwork with a single pithead
砌体圆拱式单井口三格化粪池的工艺技术及应用
21. Geological-economic evaluation model for pithead heap-leaching uranium deposits of hard-rock
硬岩型铀矿床坑口堆浸地质经济评价模型
22. Comprehensive fuzzy decision adopted in alternatives evaluation in locating the pithead building
论模糊综合决策在煤矿井口位置方案比较中的应用
23. Three closing of pithead is realized by the technology transformation of safe door with coal electric drill motor.
通过使用煤电钻电机对副井安全门进行技术改造,实现井口三闭锁。
24. By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type,the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.
通过对硬岩型铀矿坑口堆浸法的工艺流程分析,总结出坑口堆浸成本由矿石开采费用、主要原材料费用等14项要素组成,并建立了地质经济评价模型。
25. On that occasion, the miners had staged a pithead protest saying they did not want to go underground as floodwater was already pouring into the shaft despite management claims it was under control.
那时候,尽管管理层声称洪水已受到控制,矿工们曾在坑口上抗议说,由于大水已经涌入矿井,他们不想去地下。
26. Feasibility Ananlysis of Building Pithead Power Plants in North Shaanxi and Ningxia Coal Bases
陕北及宁夏煤炭基地建设坑口电站可行性分析
27. North Shaanxi and Ningxia are extremely abundant in coal resources, with excellent geographical positions and transport facilities, suitable to build large size pithead power plants.
陕北及宁夏煤炭资源极其丰富,地理条件优越,交通十分方便,适宜建设坑口电厂。
28. 3.The computer program may assist decision-making in the way of helping decision-makers to select scientificaly the average grade of ore in pithead heap-leaching mining under a total cost.
静态评价结果表明,在坑口堆浸总成本中,矿石开采费用占了相当份额,其次是土建工程及设备设施摊销费用、原材料费用。