stopes

stopes

1. Keywords displacement grade 3 zoones overlying rockdisplacement drawn stopes;

“位移梯度”;空区覆岩;“三带”;

2. "Poena damni"is the thing with feathers. That perches in the soul and sings the elegy without the words, and never stope.

“失落的痛苦”是个有羽毛的东西。它栖息在灵魂之中,唱着无词的悲歌,永远不会停息。

3. People were aghast in 1918 when Marie Stopes published her manual “Married Love”.

一位母亲这样写道:“这么污秽的东西令人恶心,我看不出那有什么作用。”

4. A passer-by stopes and drops a cion in one hat, then asks:"What's the other hat for?" "Busuness has been so flourish lately.

一位过路人停下来,她在其中一个帽子里扔下一枚硬币,然后问:“另外一个帽子是干什么的呢?”

5. Vertical slicing by filled stopes method is effective to mine fracturing ore body with theroof of moderate inclination.

中等倾斜顶板破碎矿体的开采,垂直分条充填采矿方法是一种较为有效的方法。

6. At Fengshan copper mine,the stability of ore and rock was poor and varied, and the stopes were located under the steep slope of high mountain, where the high stress was concentrated.

丰山铜矿矿岩稳固性差,变化较大,且采场位于高山陡坡之下,属于高应力集中区,巷道支护困难。

7. In order to solve the problem about lack of tailings for back-filling in Xinhui Gold Mine, the technology on mining of tailings in open pit for underground stope back-filling is investigated.

为解决鑫汇金矿矿山充填尾砂不足和减轻尾砂对环境的污染,研究将原堆放于露天坑的尾砂采出充填井下采场的工艺。

8. Quality Classification of Rock and Mineral and Determination of Stope Parameters for 10-6 Deposit, Song shujiao Mine, YTC.

云锡松矿10-6缓倾斜矿体岩矿质量分级及采场参数初定。

9. REASONS FOR BREAKAGE OF UNDERGROUND STOPES AND GANGWAYS AND THEIR PROTECTION

井巷工程破坏原因分析与防护

10. The necessary padding material,Chute structure,pattern of pedestrain raise and stope support in the application of dry back filling method are inquired.

介绍了在干式充填采矿法中,对采场所必须采用的铺垫材料、溜井结构、行人天井及采场支护等技术问题作初步探讨。

11. The technology and practice of artifical pumpcrete pillar support is briefly introduced in this paper.The mining test was carried out using the pillars, at 2364 stope of Woxi mining district.

介绍了泵送混凝土人工点柱支护工艺,并对该工艺进行了一系列可操作性试验,在湘西金矿沃溪矿区2364采场进行了采矿试验。

12. The geological conditions of Jiaojia Gold Mine are introduced,the types of engineering rock mass are classified and the methods of stope support are evaluated.

介绍了焦家金矿床的赋存地质条件,划分了工程岩体类型,介绍评价了矿山近年来应用的支护方法。

13. The plan of abandon of underground stopes is made according to ore reserves and status of ventilation.Feasibility study of optimizing underground ventilation system was conducted.

介绍矿井储量及通风状况,核定采区储量,确定采区报废方案,并对矿井通风系统优化进行可行性论证。

14. Some experiences on stope roof management in metal underground mine are introduced.

介绍金属地下矿山采场顶板管理的几点经验。

15. Taking tashan Mine as a example,according to the analysis based on the Characteristics of the Cracks in Stopes,experimental research of stress-relieve gas drainage is worried about.

以塔山矿为例,在采场裂隙特征分析基础上,实施采场卸压瓦斯抽放试验。

16. Through the examples of 13405 stope in Qingciyao coal mime of Datong coal mine group Ltd, this paper describes the method of controlling hazard gas leak by adjusting ventilation network.

以大同煤矿集团公司青磁窑煤矿13405工作面为例,介绍了通过调整局部通风系统,控制回采工作面有害气体泄出的方法。

17. Stope optimization technology forerunner,the rational layout of the stope,stope parameter optimization,and upgrading is very important.

优化采场技术先导,合理布置采场,优化采场参数,改造是极为重要的。

18. According to the need for study on methane movement law in fully mechanizedsublevl caving stopes,the methane rising and pressure diffusion theory is put forward.

依研究综放采场瓦斯运移规律的需要,提出矿井瓦斯气体浮升与压强扩散理论。

19. Roof-contacted filling and dehydration in stope are two critical problems in mines in which backfill mining method was used.

充填接顶和采场脱水是应用充填采矿法的矿山急需解决的两个技术问题。

20. Keywords Filled stopes method;Downward high drift;Cemented filling;

充填采矿法;下向高进路;胶结充填;

21. Stope pillar recovery in overall mining method

全面采矿法采场的矿柱回采

22. The prerequisite of rock burst occurrence is that the elastic energy in coal and rock mass around coal mine roadway and stope has accumulated enough.

冲击地压发生的前提是矿山井巷和采场周围的煤岩体中储存了足够的弹性能。

23. DHD technique for stope drilling,Fankou Pb/Zn mine

凡口铅锌矿采场的潜孔凿岩技术

24. That the prevention measures are not enough at the propdrawing operation in the stope is analysed at this paper, and the structure and the site application effect of DTH pushprotecter are introduced.

分析了回采工作面回柱放顶作业中防护措施的不足,介绍了DTH推护器的结构和现场应用效果。

25. That the prevention measures are not enough at the prop-drawing operation in the stope is analysed at this paper,and the structure and the site application effect of DTH push-protecter are introduced.

分析了回采工作面回柱放顶作业中防护措施的不足,介绍了DTH推护器的结构和现场应用效果。

26. The status of Panji No.2 Coal Mine mining area layout and problems of the coal and gas outburst are analyzed.The stope adjustment programs are pointed out.

分析了潘二煤矿采区布局现状及防突的难题,提出了采场调整的方案。

27. The analysis of the main causes for the ore dilution in Chengchao Iron Mine has shown that the stope structure parameters are an important factor influencing the dilution index.

分析了程潮铁矿贫化产生的主要原因,指出采场结构参数是影响贫化率指标的一个重要因素。

28. sub-level open stope succeed by fill

分段空场嗣后充填法

29. In this paper, based on the theory of extenics, the matter-element model for the stability evaluation of stope roof of the underground mine is established and the stability of No. 92 orebody in TongKeng mine of DaChang is evaluated.

利用该理论建立了地下矿山采场顶板稳定性评价的物元模型,对大厂铜坑矿92号矿体实际采场顶板稳定性进行了评价。

30. A few methods to control ground pressure of waste-lifting stope

削壁充填采场控制地压的几种方法

31. Another system of classifying mining operations is based on the method of support in the stope.

区分采矿作业的另一种方法是依据采场的支撑方式。

32. It's a PSA that against discrimination of people who living with AIDS/HIV. My final homwork for Western New Media. Supported by Marie Stopes International China.

反歧视艾滋病人的公益广告。西方新媒体的结课作业。客户:玛丽丝特普。

33. At the same time, the qinit element method was adopted as a additional approadch to analyse the numeric of stope stress and displacement.

同时,作为辅助手段用有限元法进行了采场应力和位移的数值分析。

34. As a result,the short hole shrinkage method with flat bottom structure was employed to mine the stope firstly,then stoping ore pillar by medium length hole caving method.

后沟金矿采用平底结构浅孔留矿法先采矿房,后用中深孔崩落法回采矿柱,经两年多的生产实践,取得较好的技术经济指标。

35. The stope downward ventilation technique has been used under different conditions in many places of our country.

回采工作面下行通风在我国许多地方的不同条件下均有使用。

36. Gas Synthetic Prevention on Stope During the First Coal Cutting

回采工作面初采期间瓦斯综合治理

37. So it is necessary to discuss the influence of stope leaching uranium to the environment and treat“three wastes".

因此探讨原地破碎浸出采铀对环境的影响和对“三废”的治理是十分必要的。

38. In the mining process of medium thick steeply inclined orebody,changing the relative position of manway and pass on the stope face to suit the change of orebody can reduce the dilution rate.

在中厚倾斜矿体的开采过程中,改变人道和溜井在采场面的相对位置,可适应矿体的变化,降低贫化率。

39. In the process of a drawing management of stope by sublevel caving method,the stoppedtime of drawing operation is determined based on two-indexes of both drawing volume and cut-offgrade.

在无底柱分段崩落法的采场出矿管理中,采用出矿量和截止出矿品位两个指标来确定放矿截止时间。

40. Therefore, based on the field data obtained, stope stability can be forecasted.

在此基础上,可以根据获得的现场资料,预测采场的稳定性。

41. In the undergroud stoping of Jinch-angyu,the stope stability is obviously affected by the different stoping sequence.

在金厂峪金矿深部地下采场的回采过程中,采用不同的回采顺序,对采场稳定性具有显著的影响。

42. In the test of the large diameter longhole mining of No.91 orebody at Tongkeng mine,the stress and the displacement of wall rock at the stope drilling chamber were monitored.

在铜坑矿91号矿体大直径深孔采矿法试验过程中,对采场凿岩硐室围岩的应力状态和岩移进行了监测。

43. The Scientific Pillar Design Based on Whole Mining Stope Safety

基于采场整体安全的矿柱科学设计

44. As the mining face of a certain accumulational bauxite deposit is large, the property of the stope soil has great influences on the mining activity during rains.

堆积型铝土矿床开采工作面大,雨季采场土壤的性质对生产影响严重。

45. Complex coal seam roof and floor conditions made stope support system low stiffness,poor stability and a very adverse the exploitation environment.

复杂的煤层顶底板条件使得采场支护系统刚度低、稳定性差,开采环境十分恶劣。

46. Room-and-pillar method is used for mining in most gypsum mines,and a top gypsum layer with a certain thickness in stope is reserved to keep the roof stabilization of stope.

大多数石膏矿山采用房柱法开采,通过在采场中保留一定厚度的石膏层来维护顶板的稳定性,护顶层是影响采空区稳定性的重要因素之一。

47. Sound shoot in course of sandrock failure at stope top and floor is of twin - peak character.

大姚铜矿采场顶底板砂岩在破坏过程中声发射具有双峰性,主破裂前存在声发射相对平静现象。

48. The Relations between Rockburst and the Stresses around the stope in the Tian-Shen-Qiao Tunnels.

天生桥隧洞掌子面附近的应力关系。

49. On the basis of rock mass mechanics model of cracking plate structure, it derived the calculation equation for the equivalent exposed area of mine stope.

它以板裂结构的岩体力学模型为基础,推导出了采场当量暴露面积的计算公式。

50. That perches in the soul and sings the elegy without the words,and never stope.

它栖息在灵魂之中,唱着无词的悲歌,永远不会停息。

51. Analysis on the Stability of Fill of Extra Large Stopes in Anqing Copper Mine

安庆铜矿特大型采场充填体稳定性分析

52. A STYDT ON FILLING TECHNOLOGY FOR LARGE STOPE IN ANQING COPPER MINE

安庆铜矿高大采场充填工艺技术研究

53. The transformation of the piping was made for the ventilation optimization,some practical measures for perfecting were taken,such as increasing the airshaft in the stope and using ...

实际测定结果表明,全系统的有效风量率达到75%,主要风机平均运行效率70%,彻底改善了井下通风条件,并取得明显的节能效果。

54. After entering deep mining in Fujia mine, the orebody becomed small, stope layer transition increased, and productive capacity decreased.

富家矿转入深部开采以后,矿体变小,采场转层次数频繁,生产能力降低。

55. At present, there seems no ideal way to determine reasonable structural parameter of the stopes of Sui-Chang Gold Mine.

对于遂昌金矿合理的采场结构参数,目前没有理想的确定方法。

56. The regularity of the activity of ground pressure in mine stope andthe results of controlling in the process of mining are summed up and analyzed.

对回采过程中,采场地压活动显现规律与控制效果进行了总结与分析。

57. In this paper,the unconfined uniaxial compression tests on backfills with different cement-tailings ratio in the special large-sized stope in Anqing copper mine are presented.

对安庆铜矿特大型采场不同灰砂配比的充填体进行了无侧限单轴抗压试验,根据试验测得的单轴压缩韧度参数,了解了胶结充填体的韧性性能。

58. The remoulding of tundish structure in stope bottom

对采场底部漏斗结构的改造

59. The significance of ditching ratio per ten thousand ton ores for open pits is given,and how to use this index to test productive capacity of stope is briefly discussed.

对露天矿万吨矿石开沟比的含义,及如何利用这一指标对采场生产能力进行检验,作了简要的论述。

60. Grey forecasting method and time serise analysis method were used to analyse and forecast the subsidense of the overtain strata in the trial stope.

对黄狮涝金矿试验采场上覆岩层位移进行了现场监测,并采用灰色预测法和时间序列分析法对试验采场上覆岩层的下沉规律进行了分析与预测。

61. BIOLEACHING OF REMANENT ORES IN STOPE OF SHOUWANGFEN COPPER MINE

寿王坟铜矿存窿硫化矿微生物浸出研究

62. The tailing-cemented filling promoted the technical reform in stopes in Fenghuangshan copper mine, and provided the preconditions for using the two-step ex-traction of VCR.

尾砂胶结充填推动了凤凰山铜矿采场的技术改造,为采用VCR法两步回来创造了条件;

63. Keywords rock mass;structural plane;emptied stopes;joint and fissure;stability;

岩体;结构面;采空区;节理裂隙;稳定性;

64. As Daihe Coal Mine stope and often face a lack of time for the equipment.

岱河煤矿是衰老矿井,由于受采场限制,常常出现没有时间装面的情况。

65. Current Situation and Prospect of Research on Caved Stope Drawing

崩落采场放矿研究的现状与展望

66. The theory of the gas emission used for high gassy and fully mechanized coal face at the adjacent layers is stated in the paper by means of the theory of stope three dimensional gas flow.

应用采场三维瓦斯流动理论,论述了高沼气综采工作面邻近层瓦斯抽放的基本原理。

67. A model of several levels fuzzy synthetical judgment for the geologic conditions of stopes is established.

建立了刘桥矿回采工作面地质条件多层次模糊综合评判模式。

68. The mode for evaluating stope reliability built here can not only be used for the stopes of non-coal mines, but also for all sorts of mines.

所建立的采场可靠性模糊综合评价模式,不仅适用于非煤矿山采场,而且适用于各种类型的矿山采场。

69. Study on the Motion Law Of the Lump Ore by Vibrating Drawing in Stopes

振动出矿采场大块运动规律的研究

70. The method of house-pillar was put forwardto determine the parameters of stope structure.The specif-ic engineering cases was given.

提出了一种房柱法采场结构参数的确定方法,并结合具体的工程实例进行了研究。

71. This paper first divides the instability of stopes or roadways into two types:(1)instability controlled by construction(faults and joints) and (2) instability controlled by energy.

提出了大跨度采场围岩突变失稳的两种形式:构造控制型失稳和能量控制型失稳。

72. Based on practices of some mines,the method of rock mechanics analysis suitable for design of structural parameters of stope is introduced.

提出了适用于矿山开采设计采场结构尺寸岩石力学分析方法,并通过相关矿山实例加以论述。

73. Technical measures of improving stope pillar stability

提高采场矿柱稳定性的技术措施

74. A 3-D stereogram is given showing the primary topography in AUTOCAD, utilizing the vectorized primary relief map of the slope of a mining junkyard in a certain iron ore stope.

摘要利用矢量化的某铁矿排土场边坡原地表地形图在AUTOCAD中形成原地表三维立体图。

75. The influencing factors relating to chamber stability of deep mining stope were fully analyzed, and the factors were divided into 4 types.

摘要对影响深井采场凿岩硐室稳定性的因素进行了全面分析,并将影响因素分为4类。

76. When extracting steeply-inclined thin orebody near outcrop, there normally exists triangle stopes.Many technological problems occur when extracting such stopes with common method of shrinkage stoping.

摘要急倾斜薄矿体露头附近开采时,常形成三角形不规则采场,采用普通浅孔留矿法回采存在一系列技术问题。

77. The ANFIS-based approach for back analysis of displacements was used to determine the mechanical parameters of the rock mass surrounding the stopes in block 244 in Xiangxi gold mine.

摘要本文应用位移反分析的自适应神经模糊推理方法,对湘西金矿244采场围岩的力学参数进行了反演;

78. Considering the hidden danger in the finished stopes in underground metal mines in China, a new cavity survey method based on 3D laser scanning technology is proposed for the first time in China.

摘要针对我国金属矿山存在的大量采空区安全隐患,在国内首次提出了以3D激光探测技术为基础的空区探测新方法。

79. The working principle ho application of water-isolated slurry pump in stope filling of underground rock gold mine is introduced.

文中介绍了水隔离浆体泵的工作原理及其在岩金地下矿山采场充填中的应用;

80. The effect of dip angle on the stability of inclined stope was analysed by numerical simulation method in Canzhuang Gold Mine.The optimal dip angle of the inclined stope was found out.

文中用数值模拟的方法分析了矿房倾角对蚕庄金矿倾斜试验采场稳定性的影响,找到了最佳的矿房倾角,得出了有价值的结论。

英语宝典
考试词汇表